Samphire acquisition closes
The transaction completed on 8 October 2020, bringing a new project and acquired cash into the reporting perimeter.
Alligator’s balance sheet expanded as Samphire advanced towards a field recovery trial. Repeated equity raisings financed exploration and pilot-plant work, leaving a substantial cash buffer at June 2025. That buffer, capitalised project costs and reported mineral resources are three different measures—not interchangeable evidence of a producing business.
Reading the figures: Units are stated above each table or beside the metric. Brackets denote negative amounts. Supported nil is shown as zero; unlike reporting bases remain separately labelled.
After the June placement.
Separate from expensed and impaired costs.
Not the A$5.242m comprehensive loss.
Accounting carrying amount.
The October 2020 Samphire acquisition established the current development focus. Subsequent work combined resource evaluation, engineering and trial preparation; the modular processing plant was built offsite before the final on-site approvals.
The field recovery trial is intended to generate evidence for feasibility and a mining-lease application. Interest from potential utility customers is conditional on trials and approvals, not a completed production history or recognised sales.
The transaction completed on 8 October 2020, bringing a new project and acquired cash into the reporting perimeter.
Substantial equity receipts supported the expanding programme. The right to acquire 100% of Big Lake was exercised in December 2021.
Exploration cash payments increased while no new equity cash was received in the annual cash-flow record. The balance-date cash buffer declined.
The modular pilot plant was fabricated and transported to Whyalla, with on-site construction still dependent on approvals. A September 2023 placement funded the next phase.
A retention lease was granted in January and the placement completed in June. Final trial approval came in August 2025, after year-end.
The latest financing inflow exceeded operating and investing outflows, lifting year-end cash. Interest receipts helped offset corporate cash costs, but these are returns on cash rather than uranium revenue.
A$ million
AI-generated presentation · values from Five-year loss, cash use and financing; no missing values plotted as zero.
A$ million
AI-generated presentation · values from Five-year loss, cash use and financing; no missing values plotted as zero.
A$ million
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Loss after tax | (0.991) | (2.248) | (2.855) | (3.452) | (5.911) |
| Operating cash flow | (0.790) | (1.698) | (1.526) | (1.712) | (1.978) |
| Investing cash flow | (0.056) | (2.957) | (7.078) | (15.383) | (12.398) |
| Financing cash flow | 1.573 | 30.152 | (0.025) | 26.989 | 16.134 |
| Closing cash | 1.631 | 27.128 | 18.498 | 28.392 | 30.150 |
Annual loss does not include all capitalised exploration or plant spending. Financing is a cash-flow total after raising costs and any lease payments.
FY2021 investing cash includes cash acquired with Samphire. It should not be mistaken for a year with almost no project expenditure.
Source: Annual-report extractions; report editions are listed once in the consolidated source registry.
Capitalised exploration represents a large share of assets, alongside cash. Technical judgement is required on recoverability and impairment, while the trial’s timing and results remain important to subsequent project decisions.
A$ million
AI-generated presentation · values from Cash, capitalised projects and equity; no missing values plotted as zero.
A$ million
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Total assets | 13.815 | 44.592 | 44.124 | 68.137 | 79.487 |
| Exploration and evaluation assets | 11.846 | 16.754 | 23.779 | 33.682 | 40.960 |
| Total equity | 13.346 | 44.001 | 41.441 | 65.853 | 77.353 |
| Total liabilities | 0.470 | 0.591 | 2.683 | 2.283 | 2.134 |
| Net current assets | 1.491 | 27.114 | 17.109 | 27.589 | 29.342 |
Exploration assets are accumulated carrying amounts, not the value of uranium in the ground. Net current assets is a calculated liquidity measure, not a completed project-finance commitment.
Small one- or two-dollar differences between extracted narrative and statement totals are immaterial at this display scale; statement values are retained without rewriting the inputs.
Source: Annual-report extractions; report editions are listed once in the consolidated source registry.
Plant cash spending peaked during the offsite pilot-plant build, then declined. Exploration payments remained substantial. The separate EnviroCopper investment provides exposure to copper ISR work; it is not Samphire plant capex or uranium output.
A$ million
AI-generated presentation · values from The cash cost of advancing the portfolio; no missing values plotted as zero.
A$ million
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Exploration cash payments | (0.635) | (2.873) | (6.544) | (11.230) | (10.344) |
| Plant and equipment cash payments | 0.000 | (0.057) | (0.410) | (3.053) | (0.769) |
| Gross equity cash receipts | 1.695 | 31.678 | 0.000 | 28.792 | 17.250 |
| Equity raising cash costs | (0.122) | (1.527) | 0.000 | (1.728) | (1.041) |
Plant payments, capitalised exploration and financial investments are distinct categories. FY2025 also included A$1.1m of investment payments, outside the two project-spending rows.
Attaching options are not future cash until exercised. June 2025 placement cash and later approval of options are separate events.
Source: Annual-report extractions; report editions are listed once in the consolidated source registry.
The Alligator Rivers impairment increased FY2025 expenses after a technical review and a decision not to budget significant near-term operational spending there. The equity-investment fair-value gain instead appears in OCI and does not reduce the statutory loss.
The proposed Piedmont exit, final Samphire trial approval and R&D refund were subsequent events. None is backdated into June 2025 cash or represented as commercial uranium production.
A$ million
AI-generated presentation · values from Charges outside capitalised project expenditure; no missing values plotted as zero.
A$ million
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Exploration and evaluation expense | (0.067) | (0.180) | (0.141) | (0.263) | (0.721) |
| Exploration impairment charge | (0.024) | 0.000 | (0.514) | (0.645) | (2.212) |
| Share-based payment expense | (0.027) | (0.205) | (0.250) | (0.415) | (0.534) |
These are profit-and-loss expenses, not extra cash payments. Do not add them to the cash spending table.
The FY2025 impairment relates to Alligator Rivers projects; FY2024 relates to Piedmont. A generic duplicated nil label in the extraction is not used to erase the project-specific charge.
Source: Annual-report extractions; report editions are listed once in the consolidated source registry.
A$ million
| Metric | FY2025 |
|---|---|
| Loss after tax | (5.911) |
| Equity-investment fair-value gain in OCI | 0.668 |
| Total comprehensive loss | (5.242) |
The OCI gain reduces comprehensive loss but is not operating profit or cash received. It is not netted into the five-year statutory-loss row.
Source: Annual-report extractions; report editions are listed once in the consolidated source registry.
Prepared solely from the existing year-by-year extraction datasets. No raw annual-report body, PDF, new database lookup or financial web research was used. Review is against those stored extractions, not a new independent original-document audit.
The source references in this report identify the public disclosures used and should be read with the associated section, table and reporting-period qualifications. This report paraphrases, organises and compares those disclosures for descriptive and educational purposes rather than reproducing source text.
Copyright and other rights in linked reports, company names, logos and third-party materials remain with their respective owners. MII Research does not claim affiliation with or endorsement by the company covered in this report, the ASX or cited organisations.
This report uses AI actively and extensively for evidence extraction, comparison, organisation, calculation checks, drafting, translation planning and presentation. Material claims received reasonable editorial review against cited public sources; this was not an audit, assurance engagement or independent verification. Limitations in public sources, AI systems and review may leave errors, omissions, inconsistencies or translation, classification and interpretation errors.
Any AI-generated visual accompanying this report must carry an adjacent, visible AI-generated label or caption. Such visuals are illustrative rather than source evidence and do not replace the cited annual-report text, table or section source.
This record is for general descriptive and educational information only. It is not financial-product, investment, legal, tax, technical or other professional advice; it is not a securities recommendation, valuation, target price, offer, solicitation or invitation to buy, sell or hold.
It does not consider any reader’s objectives, financial situation, needs, knowledge, experience or risk tolerance. Independently verify material information against the primary disclosures, obtain appropriate independent professional advice and do not use this record as the sole or primary basis for any decision.
Public sources are used in good faith, but no representation or warranty is made as to accuracy, completeness, reliability, currency or fitness for a particular purpose. To the maximum extent permitted by law, MII Research disclaims liability for direct, indirect, incidental, consequential, opportunity or investment loss arising from use of or reliance on this record; nothing excludes or limits liability that cannot lawfully be excluded or limited.
Report suspected errors to MII Research with the relevant report section and primary-source document and page reference so that the record can be reviewed and corrected where appropriate.