First full JWD production year
Six JWD cargoes were exported during the year; the company changed from Fe Limited to CuFe Ltd and raised A$5 million in a placement.
Five June year ends from FY2022 through FY2026. Consolidated financial amounts are Australian dollars in units unless a row says otherwise. FY2024 JWD figures use the FY2025 discontinued comparative where a continuing/discontinued split is shown; Resources and JWD physicals use their own stated bases.
Reading the tables: 0 (nil) is a supported zero. Other text distinguishes an amount included in another line, a non-applicable item, a separately unavailable component and an unresolved value. These are not interchangeable. Period-specific detail is labelled; complete year-by-year detail remains available.
A$5,137,006 consolidated loss after tax.
Consolidated cash and cash equivalents.
Net inflow, mostly new shares and option exercise.
Gecko plus Orlando, total Mineral Resources; project snapshot.
JWD iron ore dominated the early period. The FY2024 annual report showed A$96.1 million of iron ore revenue as continuing; the FY2025 report re-presented that same FY2024 activity as discontinued after the iron ore rights sale. The FY2025 A$7.0 million group profit includes A$6.25 million from discontinued operations, while FY2026 reverted to a A$5.14 million loss. These classifications govern any trend comparison.
The JWD disposal and royalty-asset sale shifted the portfolio toward Tennant Creek copper and gold. Cash reached A$19.0 million at 30 June 2026 after FY2026 financing inflows of A$21.3 million, while operating activities still used A$4.86 million. The capital raise and the larger combined Gecko and Orlando Resource are separate financing and project developments.
Six JWD cargoes were exported during the year; the company changed from Fe Limited to CuFe Ltd and raised A$5 million in a placement.
JWD was suspended from October to December 2022 and restarted in January 2023. The auditor highlighted material going-concern uncertainty.
JWD shipped 663,285 wet tonnes. A 187.5 million-share placement at A$0.016 raised A$3 million in May 2024.
The A$12 million JWD iron ore rights transaction settled on 1 November 2024; the FY2025 statement moved JWD into discontinued operations.
CuFe joined the Tennant Creek Copper Alliance in December 2025, and a TCMG share subscription of A$15.35 million was executed in May 2026. The combined Gecko and Orlando Resource reached 23,451 kt in the reported estimate.
The FY2025 group profit was principally a discontinued-operations outcome following the JWD sale; FY2026's continuing loss includes exploration, employee costs and share-based payment expense. The FY2024 split is a re-presentation of the original FY2024 result, not another revenue stream.
$ (as reported)
AI-generated presentation · values from Consolidated income: statutory result and JWD classification (A$; EPS in cents); no missing values plotted as zero.
A$ unless a row states otherwise
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Iron ore revenue classified as continuing$ (as reported) | 32,997,036 | 35,021,811 | N/A | N/A | N/A |
| Iron ore revenue classified as discontinued$ (as reported) | N/A | N/A | 96,133,892 | 14,147,699 | N/A |
| Iron ore cost of sales, continuing$ (as reported) | (34,381,296) | (40,221,450) | N/A | N/A | N/A |
| Iron ore cost of sales, discontinued$ (as reported) | N/A | N/A | (99,778,163) | (20,362,986) | N/A |
| Iron ore gross result, continuing$ (as reported) | (1,384,260) | (5,199,639) | N/A | N/A | N/A |
| Iron ore gross result, discontinued$ (as reported) | N/A | N/A | (3,644,271) | (6,215,287) | N/A |
| Other income (continuing operations subtotal)$ (as reported) | 9,132,230 | 3,211,614 | 1,978,139 | 4,155,198 | 460,503 |
| (Loss)/profit before income tax - continuing operations$ (as reported) | (164,915) | (11,154,755) | (1,004,893) | 751,897 | (5,211,927) |
| Income tax expense$ (as reported) | 0 (nil) | 0 (nil) | 0 (nil) | 0 (nil) | 0 (nil) |
| (Loss)/profit after income tax - continuing operations$ (as reported) | (164,915) | (11,154,755) | (1,004,893) | 751,897 | (5,211,927) |
| Profit/(loss) after income tax - discontinued operations$ (as reported) | N/A | N/A | (12,617,537) | 6,253,828 | 74,921 |
| (Loss)/profit for the year (total)$ (as reported) | (164,915) | (11,154,755) | (13,622,430) | 7,005,725 | (5,137,006) |
| Basic (loss)/earnings per share (total)cents per share | (0.02) | (1.15) | (1.20) | 0.52 | (0.31) |
| Basic (loss)/earnings per share - continuing operationscents per share | (0.02) | (1.15) | (0.09) | 0.05 | (0.32) |
| Basic earnings/(loss) per share - discontinued operationscents per share | N/A | N/A | (1.11) | 0.47 | 0.00 |
FY2022–FY2023 use the classification reported in those annual statements. FY2024 is shown as the FY2025 comparative: JWD iron ore sales and cost are re-presented as discontinued. The FY2024 total loss is unchanged; the FY2024 annual report originally classified A$96,133,892 iron ore revenue as continuing. Do not add both presentations.
FY2025 and FY2026 continuing operations contain no iron ore sales; other income includes one-off asset gains. FY2026 discontinued profit is residual JWD recovery. Income-tax nil cells are shown as 0 (nil) only where the period-specific statement record establishes nil.
Losses appear in parentheses. FY2024 split continuing/discontinued EPS uses the FY2025 comparative basis.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
A$ unless a row states otherwise
| Metric | FY2025 | FY2026 |
|---|---|---|
| Interest income$ (period header; scale not stated) | 77,008 | 115,698 |
| Other income$ (period header; scale not stated) | 4,155,198 | 460,503 |
| Exploration and evaluation expenditure$ | (1,791,997) | (1,903,227) |
| Employee benefits expense and director remuneration$ | (449,341) | (807,970) |
| Finance costscurrency (not stated) | (8,803) | (2,738) |
| Legal costscurrency (not stated) | (114,505) | (75,468) |
| Share-based payment expensecurrency (not stated) | (197,918) | (1,809,013) |
| Amortisation and depreciation expensecurrency (not stated) | (5,014) | (3,801) |
| Accounting and audit feescurrency (not stated) | (267,176) | (295,005) |
| Consultancy feescurrency (not stated) | (148,500) | (77,986) |
| Compliance costscurrency (not stated) | (106,598) | (159,642) |
| Other expensescurrency (not stated) | (332,738) | (438,769) |
| Share of net losses of joint venture/associate (equity method)not stated | (57,719) | (214,509) |
| (Loss)/profit before income tax – continuing operationsnot stated | 751,897 | (5,211,927) |
| (Loss)/profit after income tax – continuing operationsnot stated | 751,897 | (5,211,927) |
| Profit after tax – discontinued operationsnot stated | 6,253,828 | 74,921 |
| (Loss)/profit for the year – totalnot stated | 7,005,725 | (5,137,006) |
Exact consolidated income statement components. Exploration expense here excludes the equity-accounted JV/associate loss shown separately; management's narrative aggregates them.
FY2025 other income includes the A$4 million royalty-asset disposal gain. FY2026 other income includes investment-sale gains; the large FY2026 share-based payment is non-cash.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
Equity fell to A$5.51 million at 30 June 2024 and recovered to A$31.11 million at 30 June 2026. The FY2026 cash increase follows capital issuance while the accumulated-loss balance increased.
$
AI-generated presentation · values from Consolidated financial position at each 30 June (A$); no missing values plotted as zero.
$
AI-generated presentation · values from Consolidated financial position at each 30 June (A$); no missing values plotted as zero.
A$ unless a row states otherwise
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Cash and cash equivalents$ | 7,193,910 | 3,896,360 | 7,546,861 | 2,233,916 | 19,034,726 |
| Restricted cash (term deposits)$ | 469,242 | 360,000 | 360,000 | 0 (nil) | N/P |
| Inventory$ | 4,568,168 | 3,711,719 | 5,613,374 | 0 (nil) | N/P |
| Trade and other receivables$ | 4,621,391 | 3,040,933 | 6,655,486 | 386,054 | 286,573 |
| Other current assets / financial asset (current)$ | 177,485 | 147,141 | 166,674 | 75,866 | 42,944 |
| Financial asset (current) — Note 9$ | 3,405,067 | 318,818 | 1,951,960 | 98,444 | 0 (nil) |
| Total current assets$ | 20,435,263 | 11,474,971 | 22,294,355 | 2,794,280 | 19,364,243 |
| Exploration and evaluation expenditure (non-current)$ | 8,866,852 | 9,184,992 | 9,038,292 | 9,078,217 | 9,128,217 |
| Mine properties and development costs (non-current)$ | 5,331,936 | 1,793,658 | 0 (nil) | 0 (nil) | N/P |
| Plant and equipment$ | 22,900 | 22,628 | 15,087 | 10,073 | 8,816 |
| Investments accounted for using the equity method$ | 2,999,352 | 2,409,727 | 3,138,916 | 3,138,916 | 3,170,266 |
| Total non-current assets$ | 17,549,995 | 13,411,005 | 12,192,295 | 12,227,206 | 12,307,299 |
| TOTAL ASSETS$ | 37,985,258 | 24,885,976 | 34,486,650 | 15,021,486 | 31,671,542 |
| Trade and other payables (current)$ | 11,147,544 | 8,586,775 | 27,551,118 | 1,558,648 | 557,006 |
| Interest-bearing borrowings (current)$ | 1,304,510 | 1,797,624 | 0 (nil) | 0 (nil) | N/P |
| Provisions (current)$ | 131,208 | 131,208 | 1,424,558 | 357,622 | N/P |
| Total Current Liabilities$ | 12,860,114 | 10,515,607 | 28,975,676 | 1,916,270 | 557,006 |
| Provisions (non-current)$ | 505,637 | 566,189 | 0 (nil) | N/P | N/P |
| Total Non-Current Liabilities$ | 505,637 | 566,189 | 0 (nil) | N/P | N/P |
| TOTAL LIABILITIES$ | 13,365,751 | 11,081,796 | 28,975,676 | 1,916,270 | 557,006 |
| NET ASSETS / TOTAL EQUITY$ | 24,619,507 | 13,804,180 | 5,510,974 | 13,105,216 | 31,114,536 |
FY2025's own note separates trade/other payables (A$1,558,648) and current provisions (A$357,622); the FY2026 statement combines these in its FY2025 comparative as A$1,916,270 payables. Total liabilities and equity are unchanged. Components should not be added across those two presentations.
Assets and liabilities are period-end stocks. Capitalised exploration is an asset; cash purchases of exploration assets belong in the cash-flow table. Reported nil is shown as 0 (nil), while a missing separate line remains not separately presented.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
A$
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Contributed equity | 58,622,052 | 58,847,052 | 64,004,653 | 64,108,853 | 85,446,166 |
| Accumulated losses | (38,248,811) | (49,403,566) | (63,025,996) | (56,020,271) | (61,157,277) |
| Total reserves | 4,246,266 | 4,360,694 | 4,532,317 | 5,016,634 | 6,825,647 |
| Total equity | 24,619,507 | 13,804,180 | 5,510,974 | 13,105,216 | 31,114,536 |
FY2025 components use the FY2026 statement's comparative column for a clear row mapping. This does not change FY2025 reported total equity.
Source: CuFe annual reports; selected original statement and note rows in the evidence register.
FY2025 operating cash outflow coincided with the final JWD operating period; investing cash included JWD and royalty-asset proceeds. FY2026 cash growth came from equity financing despite negative operating cash flow.
$
AI-generated presentation · values from Consolidated cash flow and cash reconciliation (A$); no missing values plotted as zero.
A$ unless a row states otherwise
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Net cash flows from/(used in) operating activities$ | (3,538,360) | (7,912,583) | 5,319,732 | (24,630,003) | (4,858,021) |
| Net cash flows from/(used in) investing activities$ | (796,078) | 4,626,707 | (2,846,567) | 19,317,058 | 340,700 |
| Net cash flows from/(used in) financing activities$ | 5,697,500 | (11,674) | 1,177,336 | 0 (nil) | 21,318,131 |
| Net increase/(decrease) in cash and cash equivalents$ | 1,363,062 | (3,297,550) | 3,650,501 | (5,312,945) | 16,800,810 |
| Cash and cash equivalents at beginning of year$ | 5,830,848 | 7,193,910 | 3,896,360 | 7,546,861 | 2,233,916 |
| Cash and cash equivalents at end of year$ | 7,193,910 | 3,896,360 | 7,546,861 | 2,233,916 | 19,034,726 |
FY2025 JWD disposal proceeds are investing cash flow, while FY2025 operating cash flow reflects the final iron ore operating period. FY2026 financing inflow is chiefly share issuance and option exercise.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
A$
| Metric | FY2025 | FY2026 |
|---|---|---|
| Receipts from customers | 15,170,119 | 0 (nil) |
| Payments to suppliers and employees | (38,093,010) | (2,714,265) |
| Interest received | 92,803 | 100,892 |
| Payments for exploration and evaluation | (1,789,666) | (1,868,250) |
| Payments of interest and other finance costs | (10,249) | 0 (nil) |
| Interest withholding tax paid | 0 (nil) | (152,144) |
| Stamp duty paid | 0 (nil) | (224,254) |
| Net operating cash flow | (24,630,003) | (4,858,021) |
This is the direct cash-flow presentation, not the accrual income statement. FY2026 customer receipts are printed as a dash and shown Nil; cash interest and taxes remain separate from profit-and-loss amounts.
Source: CuFe annual reports; selected original statement and note rows in the evidence register.
A$ unless a row states otherwise
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Purchase of exploration assets$ | (5,091,352) | (308,165) | (82,204) | (14,925) | (50,000) |
| Purchase of plant and equipment$ | (6,518) | (8,993) | 0 (nil) | N/P | N/P |
| Payments for capitalised mine development$ | (900,958) | (51,570) | (443,040) | 0 (nil) | N/P |
| Cash consideration paid (JWD Restructure Transaction)A$ | Not applicable | 0 (nil) | (500,000) | (1,210,000) | 0 (nil) |
| Proceeds from sale of JWD Project (Iron Ore Rights)$ | N/A | N/A | N/A | 12,000,000 | 0 (nil) |
| Proceeds from sale of royalty asset$ | N/A | N/A | N/A | 4,000,000 | 0 (nil) |
| Receipts/(payments) from commodity collar/swaps transactions closed$ | 5,559,470 | 5,993,663 | (1,164,467) | 4,301,124 | (2,544) |
| Investment in joint venture (Yarram JV from FY2025)$ | (532,063) | (1,107,470) | (638,654) | (115,441) | 45,422 |
| Investment in associate (TCCA)$ | N/A | N/A | N/A | 0 (nil) | (160,100) |
| Proceeds on sale of investment (FY2026 transaction)$ | Not applicable | Not applicable | Not applicable | 0 (nil) | 546,227 |
The A$12 million JWD investing cash-flow line is the gross transaction measure used in the cash-flow statement; the issuer says A$7.081 million was received in cash and the balance offset against trade creditors at settlement. It is distinct from disposal profit and from PP&E assets.
Commodity collar/swap cash movements are investing lines in these reported statements. The table is selected material components, not a full subtotal reconciliation.
Cash consideration is the JWD Restructure Transaction line: FY2022 is before that transaction and FY2023 is nil in the FY2024 comparative. The FY2026 investment-sale receipt is a distinct one-off line; earlier years are marked not applicable to that sale.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
A$ unless a row states otherwise
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
| Proceeds from shares issued (net of costs)$ | 4,592,562 | 0 (nil) | 2,810,000 | 0 (nil) | 20,428,756 |
| Proceeds from exercise of options$ | 355,000 | 225,000 | 0 (nil) | 0 (nil) | 889,375 |
| Proceeds from borrowings$ | 9,551,504 | 17,244,660 | 21,176,689 | 4,895,692 | 0 (nil) |
| Repayment of borrowings$ | (8,456,845) | (17,188,975) | (22,809,353) | (4,895,692) | 0 (nil) |
| Principal payments on lease liabilities$ | (344,721) | (292,359) | Nil | N/P | N/P |
Share-issue proceeds here are net of costs and differ from gross placements and non-cash consideration-share values. Borrowing proceeds and repayments are both shown to retain the turnover behind a small net movement.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
Shares on issue expanded across the period, especially in FY2024 and FY2026. The share count is a period-end number; net issue cash and gross placement amounts are different measures. The five selected annual packages report no dividends declared or paid.
shares
AI-generated presentation · values from Ordinary share capital and issuance (shares unless noted); no missing values plotted as zero.
JWD shipments rose through FY2024 on a 100% project basis, before the rights sale changed the operating scope. The combined Tennant Creek Mineral Resource total reported in FY2026 is a project estimate and is distinct from CuFe's balance-sheet carrying values and ownership interests.
wmt
AI-generated presentation · values from JWD iron ore physical output, 100% project basis; no missing values plotted as zero.
A$ unless a row states otherwise
| Metric | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
| Ore minedwmt | 697,248 | 509,058 | 847,756 |
| Ore processedwmt | 564,074 | 489,215 | 849,570 |
| Ore shippedwmt | 330,747 | 418,706 | 663,285 |
These physical measures are 100% project basis, while CuFe held 60% of the Wiluna Iron JV during FY2022–FY2023 and stepped to 100% in FY2024. They are not CuFe attributable tonnes.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
A$ unless a row states otherwise
| Metric | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
| Revenue (FOB) realised – USD/wmtUS$/wmt | 117.19 | 93.52 | 102.81 |
| Revenue (FOB) realised – AUD/wmtA$/wmt | 162.35 | 136.12 | 152.28 |
| Realised hedging gains/(losses) – AUD/wmtA$/wmt | 26.93 | 24.62 | 0.20 |
| Total revenue – AUD/wmtA$/wmt | 189.28 | 160.73 | 152.49 |
| C1 cost per wmt shipped – AUD/wmtA$/wmt | 158.59 | 142.70 | 140.57 |
FOB realised USD and AUD pricing, hedging and C1 cost are source defined operational measures. C1 cost is not total statutory cost of sales.
Source: CuFe annual reports, selected consolidated statement or note rows; source registry below.
Tonnage kt; grades as stated
| Metric | FY2025 report | FY2026 report |
|---|---|---|
| Combined total Resource tonneskt | 10,350 | 23,451 |
| Combined copper grade% | 1.53 | 1.73 |
| Combined gold gradeg/t | 1.07 | 0.72 |
These are project Resource snapshots, not balance-sheet assets or production. FY2026 source table totals Gecko plus Orlando, with 16,669 kt Indicated and 6,782 kt Inferred; it is not a Gecko-only figure. Reporting dates follow the annual report table and should not be presumed to be the fiscal balance date.
Source: CuFe annual reports; selected original statement and note rows in the evidence register.
Prepared from the existing annual extraction datasets, supplemented only by selected same-company annual-report tables and saved row interpretations. No new raw-document extraction or web financial research was used for this test.
The source references in this report identify the public disclosures used and should be read with the associated section, table and reporting-period qualifications. This report paraphrases, organises and compares those disclosures for descriptive and educational purposes rather than reproducing source text.
Copyright and other rights in linked reports, company names, logos and third-party materials remain with their respective owners. MII Research does not claim affiliation with or endorsement by the company covered in this report, the ASX or cited organisations.
This report uses AI actively and extensively for evidence extraction, comparison, organisation, calculation checks, drafting, translation planning and presentation. Material claims received reasonable editorial review against cited public sources; this was not an audit, assurance engagement or independent verification. Limitations in public sources, AI systems and review may leave errors, omissions, inconsistencies or translation, classification and interpretation errors.
Any AI-generated visual accompanying this report must carry an adjacent, visible AI-generated label or caption. Such visuals are illustrative rather than source evidence and do not replace the cited annual-report text, table or section source.
This record is for general descriptive and educational information only. It is not financial-product, investment, legal, tax, technical or other professional advice; it is not a securities recommendation, valuation, target price, offer, solicitation or invitation to buy, sell or hold.
It does not consider any reader’s objectives, financial situation, needs, knowledge, experience or risk tolerance. Independently verify material information against the primary disclosures, obtain appropriate independent professional advice and do not use this record as the sole or primary basis for any decision.
Public sources are used in good faith, but no representation or warranty is made as to accuracy, completeness, reliability, currency or fitness for a particular purpose. To the maximum extent permitted by law, MII Research disclaims liability for direct, indirect, incidental, consequential, opportunity or investment loss arising from use of or reliance on this record; nothing excludes or limits liability that cannot lawfully be excluded or limited.
Report suspected errors to MII Research with the relevant report section and primary-source document and page reference so that the record can be reviewed and corrected where appropriate.