ASX: SFX · Five-year financial review

Sheffield Resources Limited (ASX: SFX) - Five-Year Financial Review FY2021-FY2025

Five June-year annual reports. Sheffield's consolidated statements are in Australian dollars, generally A$'000; KMS joint-venture statements show 100% of that entity and are not proportionately consolidated. Operational prices use the currencies and denominators stated per row.

Financial years ended 30 June 2021, 2022, 2023, 2024 and 2025 · Editorial review: 2026-09-24 · MII Research

Reading the tables: 0 (nil) is a supported zero. Other text distinguishes an amount included in another line, a non-applicable item, a separately unavailable component and an unresolved value. These are not interchangeable. Period-specific detail is labelled; complete year-by-year detail remains available.

FY2025 Sheffield loss
A$22.050m

Consolidated statutory loss after tax; includes equity-accounted KMS result.

FY2025 Sheffield cash
A$7.088m

Consolidated cash at 30 June 2025; excludes KMS's own cash balance.

FY2025 KMS revenue
A$243.585m

100% joint-venture continuing-operations revenue, not Sheffield consolidated sales.

Five years in context

The five years span KMS joint-venture formation, Thunderbird financing and construction, then the mine's first production and first full operating year. Sheffield's reported profit changed with one-off asset gains and its equity-accounted share of KMS losses; the joint venture's sales and project borrowings belong to a different reporting boundary.

Sheffield retained a 50% interest in KMS. Its carrying amount declined from A$143.938m at 30 June 2023 to A$103.328m at 30 June 2025, while KMS's 100% statements show the financing, plant assets and production cash flows behind the project. The separate tables below preserve that distinction.

Events behind the numbers

FY2021

KMS partnership established

On 12 March 2021 Yansteel subscribed for a 50% interest in KMS for A$130.1m, establishing the 50:50 Thunderbird venture. Sheffield recognised a loss-of-control gain in its consolidated result.

FY2022

Asset sale and Thunderbird feasibility

Sheffield received A$36m from the Eneabba/McCalls disposal and recognised an A$29.160m gain. The KMS bankable feasibility study and construction contracting advanced the project before final investment decision.

FY2023

Thunderbird final investment decision

KMS made its final investment decision on 7 October 2022 and reached financial close on senior project facilities and equity funding. Construction progressed toward commissioning.

FY2024

First ore and concentrate shipments

First ore production occurred in October 2023; first packaged product was exported in January 2024 and inaugural bulk shipments left Broome in March 2024.

FY2025

First full production year and debt covenant waiver

Thunderbird completed its first full production year. Oversize material and maintenance constrained output, while KMS's loan-life-cover covenant breach at 30 June 2025 was covered by written waivers deferring testing.

FINANCIAL REVIEW / 01

Consolidated earnings and KMS results

Sheffield's FY2021 and FY2022 profits included the A$43.987m loss-of-control gain and A$29.160m Eneabba/McCalls sale gain. Subsequent losses include its 50% equity-accounted KMS result. The KMS operating statement below presents the whole joint venture and must be read separately from Sheffield's consolidated statement.

Sheffield profit or loss

$'000

Sheffield profit or lossNet profit / (loss) after income tax: FY2021 28,008; FY2022 26,079; FY2023 (8,610); FY2024 (32,191); FY2025 (22,050)-36k-18k-28617k35kFY2021FY2022FY2023FY2024FY2025Net profit / (loss) after income tax, FY2021: 28,008 $'00028,008Net profit / (loss) after income tax, FY2022: 26,079 $'00026,079Net profit / (loss) after income tax, FY2023: (8,610) $'000(8,610)Net profit / (loss) after income tax, FY2024: (32,191) $'000(32,191)Net profit / (loss) after income tax, FY2025: (22,050) $'000(22,050)
Net profit / (loss) after income tax
A$'000; statutory consolidated result includes one-off FY2021–22 gains.

AI-generated presentation · values from Sheffield consolidated profit or loss; no missing values plotted as zero.

Sheffield consolidated profit or loss

A$'000 except EPS

MetricFY2021FY2022FY2023FY2024FY2025
Other income (FY2021–22) / interest income (FY2023–25)$'000330836081,050362
Gain on loss of control / asset sale$'00043,98729,1600 (nil)Not applicableNot applicable
Share of KMS joint-venture result$'000(3,717)(866)(5,368)(27,638)(20,472)
Employee benefits expenses$'000(2,958)(1,263)(1,605)(1,701)(1,528)
Share-based payments expenses$'000(1,027)(1,160)(914)(706)(483)
Other corporate expenses (issuer labels vary)$'000(3,100)(961)(1,330)(1,833)(1,017)
Net fair value change on financial assets$'000Not applicableNot applicable0 (nil)(1,361)1,090
Finance costs / bank fees$'000(3,441)(2)(1)(2)(2)
Net profit / (loss) before income tax$'00029,09624,991(8,610)(32,191)(22,050)
Income tax (expense) / benefit$'000(1,088)1,088nilnilnil
Net profit / (loss) after income tax$'00028,00826,079(8,610)(32,191)(22,050)
Basic EPScents/share8.197.53(2.39)(8.19)(5.59)
Diluted EPScents/share8.047.44(2.39)(8.19)(5.59)

Consolidated Sheffield accounts include its equity-accounted share of KMS, not 100% of KMS revenue or debt. FY2021 and FY2022 profits include distinct one-off gains. FY2021 statement also shows depreciation, exploration impairment, occupancy and legal costs omitted from this condensed view.

Other income was relabelled interest income in later statements. FY2023 source-supported nil gain and fair-value change are shown as 0 (nil); distinct FY2021 and FY2022 one-off gains are not projected into later years.

Basis and presentation notes (6)
  • Gain on loss of control / asset sale / FY2023 — 0 (nil): FY2023 Gain on loss of control / asset sale is issuer-reported nil in R003099 for the matching period and basis.
  • Gain on loss of control / asset sale / FY2024 — Not applicable: This row retains the distinct FY2021 loss-of-control and FY2022 asset-sale gains; no amount from those transactions applies to FY2024.
  • Gain on loss of control / asset sale / FY2025 — Not applicable: This row retains the distinct FY2021 loss-of-control and FY2022 asset-sale gains; no amount from those transactions applies to FY2025.
  • Net fair value change on financial assets / FY2021 — Not applicable: The FVTPL instrument separately presented from FY2024 was not held in FY2021; this later investment measure does not apply.
  • Net fair value change on financial assets / FY2022 — Not applicable: The FVTPL instrument separately presented from FY2024 was not held in FY2022; this later investment measure does not apply.
  • Net fair value change on financial assets / FY2023 — 0 (nil): FY2023 Net fair value change on financial assets is issuer-reported nil in R004331 for the matching period and basis.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

KMS joint venture profit or loss (100% basis)

A$'000

MetricFY2023FY2024FY2025
Revenue from continuing operations$'000Not applicable71,958243,585
Mining expenses$'000Not separately presented(57,243)(117,221)
Processing expenses$'000Not applicable(12,115)(28,442)
Logistics expenses$'000Not applicable(19,893)(44,688)
Non-process infrastructure & maintenance$'000Not applicable(15,938)(14,213)
Royalty expenses$'000Not applicable(4,480)(12,968)
Change in inventories$'000Not separately presented32,715(1,993)
Loss before financing costs & income tax$'000(6,935)(42,141)(12,519)
Finance income2146156
Finance costs$'000(8,477)(37,409)(28,581)
Loss before income tax (100%)$'000(15,391)(79,504)(40,944)
Income tax benefit4,65424,2290 (nil)
Loss after income tax (100%)$'000(10,737)(55,275)(40,944)

These are 100% KMS figures supplied in Sheffield's joint-venture note. This selected-line statement retains reported subtotals while site administration, general administration, depreciation and other expense lines remain outside the condensed display. FY2023 was pre-production: dashed operating lines are not applicable and blank mining/inventory cells are not established amounts. FY2024 included a reported A$24.229m tax benefit; the FY2025 benefit is issuer-reported nil.

Basis and presentation notes (8)
  • Revenue from continuing operations / FY2023 — Not applicable: FY2023 KMS was pre-production; the selected audited 2023 column marks this operating line with a dash.
  • Mining expenses / FY2023 — Not separately presented: The FY2023 column is blank in the selected audited KMS income table; no amount or nil status is established.
  • Processing expenses / FY2023 — Not applicable: FY2023 KMS was pre-production; the selected audited 2023 column marks this operating line with a dash.
  • Logistics expenses / FY2023 — Not applicable: FY2023 KMS was pre-production; the selected audited 2023 column marks this operating line with a dash.
  • Non-process infrastructure & maintenance / FY2023 — Not applicable: FY2023 KMS was pre-production; the selected audited 2023 column marks this operating line with a dash.
  • Royalty expenses / FY2023 — Not applicable: FY2023 KMS was pre-production; the selected audited 2023 column marks this operating line with a dash.
  • Change in inventories / FY2023 — Not separately presented: The FY2023 column is blank in the selected audited KMS income table; no amount or nil status is established.
  • Income tax benefit / FY2025 — 0 (nil): FY2025 Income tax benefit is issuer-reported nil in R005725 for the matching period and basis.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

FINANCIAL REVIEW / 02

Financial position and project funding

At 30 June 2025 Sheffield carried A$103.328m of KMS investment and A$7.088m of consolidated cash. KMS itself had A$14.858m cash and A$255.632m reported borrowings on a 100% basis; the latter is not Sheffield consolidated debt. KMS's loan-life-cover covenant was breached at the year-end and the lenders issued waivers deferring testing.

Sheffield closing cash

$'000

Sheffield closing cashCash and cash equivalents: FY2021 6,519; FY2022 40,223; FY2023 24,407; FY2024 9,878; FY2025 7,088011k23k34k45kFY2021FY2022FY2023FY2024FY2025Cash and cash equivalents, FY2021: 6,519 $'0006,519Cash and cash equivalents, FY2022: 40,223 $'00040,223Cash and cash equivalents, FY2023: 24,407 $'00024,407Cash and cash equivalents, FY2024: 9,878 $'0009,878Cash and cash equivalents, FY2025: 7,088 $'0007,088
Cash and cash equivalents
Consolidated Sheffield cash only; KMS cash appears in a separate table.

AI-generated presentation · values from Sheffield consolidated financial position at 30 June; no missing values plotted as zero.

Sheffield consolidated financial position at 30 June

A$'000

MetricFY2021FY2022FY2023FY2024FY2025
Cash and cash equivalents$'0006,51940,22324,4079,8787,088
Trade and other receivables$'00029742645335
Total current assets$'0006,81640,26524,4719,9317,123
Investment in joint venture$'000116,401115,535143,938123,800103,328
Financial assets at fair value through profit or loss (CMET)$'000———1,0722,581
Exploration and evaluation assets$'0006,6480 (nil)1,5083,7743,774
Total non-current assets$'000123,049115,535145,446128,646109,683
Total assets$'000129,865155,800169,917138,577116,806
Trade and other payables$'000335112183304116
Current provisions$'0005562119143127
Total current liabilities$'000390174302447243
Deferred tax liabilities$'0001,0880 (nil)———
Total liabilities$'0001,478174302447243
Net assets$'000128,387155,626169,615138,130116,563
Issued capital$'000133,091133,091155,309155,674156,224
Reserves$'00012,15013,31013,69114,03213,965
Accumulated losses / (retained earnings)$'000(16,854)9,225615(31,576)(53,626)

KMS assets and liabilities are not consolidated line by line. The investment in KMS is carried as a single equity-accounted asset. Net assets equal total equity; the duplicated total-equity row is omitted.

FVTPL instruments were first separately presented in FY2024. Deferred tax liability is separately shown only where the balance sheet carries it.

Basis and presentation notes (8)
  • Financial assets at fair value through profit or loss (CMET) / FY2021 — —: CMET FVTPL investment was not held before FY2024.
  • Financial assets at fair value through profit or loss (CMET) / FY2022 — —: CMET FVTPL investment was not held before FY2024.
  • Financial assets at fair value through profit or loss (CMET) / FY2023 — —: CMET FVTPL investment was not held before FY2024.
  • Exploration and evaluation assets / FY2022 — 0 (nil): FY2022 Exploration and evaluation assets is issuer-reported nil in R002160 for the matching period and basis.
  • Deferred tax liabilities / FY2022 — 0 (nil): FY2022 Deferred tax liabilities is issuer-reported nil in R002172 for the matching period and basis.
  • Deferred tax liabilities / FY2023 — —: No deferred tax liability line in the source balance sheet for this year.
  • Deferred tax liabilities / FY2024 — —: No deferred tax liability line in the source balance sheet for this year.
  • Deferred tax liabilities / FY2025 — —: No deferred tax liability line in the source balance sheet for this year.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

KMS joint venture financial position (100% basis)

A$'000

MetricFY2022FY2023FY2024FY2025
Cash and cash equivalents$'00053,19795,21115,35014,858
Inventories$'00019418634,70433,852
Plant and equipment$'00010,57222,849255,249467,206
Right of use assets$'0002,0991,73994,70081,619
Mine properties and development$'000160,960383,629268,79784,714
Total non-current assets$'000179,493533,893650,174661,559
Total assets$'000234,764632,089728,672716,063
Current borrowings$'000—0 (nil)9,77534,911
Non-current borrowings$'000—229,818238,753220,721
Total current liabilities$'00023,35823,42254,501127,790
Total non-current liabilities$'00013,922364,378470,157425,203
Total liabilities$'00037,280387,800524,658552,993
Net assets (100% JV)$'000197,484244,289204,014163,070

The entire KMS balance sheet is shown, not Sheffield's 50% ownership share. Project construction, plant capitalisation and borrowings change the balance-sheet mix. FY2024 values use the FY2025 audited comparative where cited.

Basis and presentation notes (3)
  • Current borrowings / FY2022 — —: The project facilities were entered after 30 June 2022.
  • Current borrowings / FY2023 — 0 (nil): FY2023 Current borrowings is issuer-reported nil in R004044 for the matching period and basis.
  • Non-current borrowings / FY2022 — —: The project facilities were entered after 30 June 2022.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

KMS project debt and lease obligations (100% basis)

A$'000

MetricFY2023FY2024FY2025
Orion Mineral Royalty Fund – current$'0000 (nil)9,77534,911
Orion Mineral Royalty Fund – non-current$'000136,46881,72863,275
NAIF – non-current government debt$'00093,350157,025157,446
Total borrowings (current + non-current)$'000229,818248,528255,632
Royalty make-whole (non-current, other financial liabilities)$'000112,696116,52793,971
Lease liabilities – current$'00029310,22411210
Lease liabilities – non-current$'0001,75185,37873515
Total lease liabilities$'0002,04495,60284725

Borrowings, the royalty make-whole and lease liabilities are separate obligations; do not add the latter two into reported total borrowings. The Orion facility partly moved to current maturities. The 30 June 2025 loan-life-cover covenant breach was subject to lender waivers deferring testing.

Basis and presentation notes (1)
  • Orion Mineral Royalty Fund – current / FY2023 — 0 (nil): FY2023 Orion Mineral Royalty Fund – current is issuer-reported nil in R004044 for the matching period and basis.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

FINANCIAL REVIEW / 03

Cash generation and construction spending

Sheffield's FY2022 investing inflow included A$36m from the Eneabba/McCalls disposal. KMS drew project financing during construction and its operating cash flow turned positive in FY2025, while mine-development spending continued. The two cash-flow tables have different accounting boundaries.

Sheffield cash-flow subtotals

$'000

Sheffield cash-flow subtotalsNet cash used in operating activities: FY2021 (7,257); FY2022 (2,128); FY2023 (2,226); FY2024 (2,305); FY2025 (2,370) | Net cash used in investing activities: FY2021 (5,827); FY2022 35,832; FY2023 (35,305); FY2024 (12,193); FY2025 (420) | Net cash from / (used in) financing activities: FY2021 12,520; FY2022 0 (nil); FY2023 21,715; FY2024 (31); FY2025 0 (nil)-40k-19k2,39823k44kFY2021FY2022FY2023FY2024FY2025Net cash used in operating activities, FY2021: (7,257) $'000Net cash used in operating activities, FY2022: (2,128) $'000Net cash used in operating activities, FY2023: (2,226) $'000Net cash used in operating activities, FY2024: (2,305) $'000Net cash used in operating activities, FY2025: (2,370) $'000Net cash used in investing activities, FY2021: (5,827) $'000Net cash used in investing activities, FY2022: 35,832 $'000Net cash used in investing activities, FY2023: (35,305) $'000Net cash used in investing activities, FY2024: (12,193) $'000Net cash used in investing activities, FY2025: (420) $'000Net cash from / (used in) financing activities, FY2021: 12,520 $'000Net cash from / (used in) financing activities, FY2022: 0 (nil) $'000Net cash from / (used in) financing activities, FY2023: 21,715 $'000Net cash from / (used in) financing activities, FY2024: (31) $'000Net cash from / (used in) financing activities, FY2025: 0 (nil) $'000
Net cash used in operating activitiesNet cash used in investing activitiesNet cash from / (used in) financing activities
Signed A$'000 cash-flow subtotals.

AI-generated presentation · values from Sheffield consolidated cash flow; no missing values plotted as zero.

KMS cash-flow subtotals

$'000

KMS cash-flow subtotalsNet cash from / (used in) operating activities: FY2021 163; FY2022 (125); FY2023 (4,043); FY2024 (84,234); FY2025 17,093 | Net cash used in investing activities: FY2021 (8,320); FY2022 (74,578); FY2023 (227,965); FY2024 (93,650); FY2025 (23,561) | Net cash from / (used in) financing activities: FY2021 134,635; FY2022 (317); FY2023 274,022; FY2024 98,063; FY2025 6544-258k-110k38k186k334kFY2021FY2022FY2023FY2024FY2025Net cash from / (used in) operating activities, FY2021: 163 $'000Net cash from / (used in) operating activities, FY2022: (125) $'000Net cash from / (used in) operating activities, FY2023: (4,043) $'000Net cash from / (used in) operating activities, FY2024: (84,234) $'000Net cash from / (used in) operating activities, FY2025: 17,093 $'000Net cash used in investing activities, FY2021: (8,320) $'000Net cash used in investing activities, FY2022: (74,578) $'000Net cash used in investing activities, FY2023: (227,965) $'000Net cash used in investing activities, FY2024: (93,650) $'000Net cash used in investing activities, FY2025: (23,561) $'000Net cash from / (used in) financing activities, FY2021: 134,635 $'000Net cash from / (used in) financing activities, FY2022: (317) $'000Net cash from / (used in) financing activities, FY2023: 274,022 $'000Net cash from / (used in) financing activities, FY2024: 98,063 $'000Net cash from / (used in) financing activities, FY2025: 6544 $'000
Net cash from / (used in) operating activitiesNet cash used in investing activitiesNet cash from / (used in) financing activities
KMS 100% basis, signed A$'000.

AI-generated presentation · values from KMS joint venture cash flow (100% basis); no missing values plotted as zero.

Sheffield consolidated cash flow

A$'000

MetricFY2021FY2022FY2023FY2024FY2025
Payments to suppliers and employees (combined)$'000(7,298)(2,326)(2,808)(3,379)(2,730)
Payments to employees (split presentation)$'000Included in combined lineIncluded in combined lineIncluded in combined lineIncluded in combined line(1,563)
Payments to suppliers (split presentation)$'000Included in combined lineIncluded in combined lineIncluded in combined lineIncluded in combined line(1,167)
Interest received$'00041835831,076362
Net cash used in operating activities$'000(7,257)(2,128)(2,226)(2,305)(2,370)
Proceeds from Eneabba/McCalls asset disposal—36,000———
Payments for exploration and evaluation expenditure$'000(795)(195)0 (nil)(2,260)0 (nil)
Investment in joint venture$'000—0 (nil)(33,771)(7,500)0 (nil)
Investment in financial assets$'000——0 (nil)(2,433)(420)
Net cash used in investing activities$'000(5,827)35,832(35,305)(12,193)(420)
Proceeds from issue of shares$'00012,8820 (nil)22,6850 (nil)—
Net cash from / (used in) financing activities$'00012,5200 (nil)21,715(31)0 (nil)
Net increase / (decrease) in cash and cash equivalents$'000(564)33,704(15,816)(14,529)(2,790)
Cash and cash equivalents at end of period$'0006,51940,22324,4079,8787,088

Signed statutory cash flows: parentheses are outflows. FY2022 investing inflow includes A$36m asset-sale proceeds. FY2025 employee and supplier payments are separately reported and sum to the displayed combined A$2.730m outflow; FY2021–FY2024 have reported combined lines, so the retained component rows say Included in combined line. Several FY2022 figures come from the FY2023 report's FY2022 comparative. Component rows are selected drivers, not a full subtotal reconciliation.

Basis and presentation notes (25)
  • Payments to employees (split presentation) / FY2021 — Included in combined line: FY2021 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to employees (split presentation) / FY2022 — Included in combined line: FY2022 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to employees (split presentation) / FY2023 — Included in combined line: FY2023 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to employees (split presentation) / FY2024 — Included in combined line: FY2024 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2021 — Included in combined line: FY2021 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2022 — Included in combined line: FY2022 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2023 — Included in combined line: FY2023 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2024 — Included in combined line: FY2024 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Proceeds from Eneabba/McCalls asset disposal / FY2021 — —: The FY2022 asset sale had not occurred.
  • Proceeds from Eneabba/McCalls asset disposal / FY2023 — —: One-off FY2022 transaction.
  • Proceeds from Eneabba/McCalls asset disposal / FY2024 — —: One-off FY2022 transaction.
  • Proceeds from Eneabba/McCalls asset disposal / FY2025 — —: One-off FY2022 transaction.
  • Payments for exploration and evaluation expenditure / FY2023 — 0 (nil): FY2023 Payments for exploration and evaluation expenditure is issuer-reported nil in R003028 for the matching period and basis.
  • Payments for exploration and evaluation expenditure / FY2025 — 0 (nil): FY2025 Payments for exploration and evaluation expenditure is issuer-reported nil in R005561 for the matching period and basis.
  • Investment in joint venture / FY2021 — —: FY2021 JV formation is reflected in deconsolidation and separate KMS equity; no like-for-like cash-flow line here.
  • Investment in joint venture / FY2022 — 0 (nil): FY2022 Investment in joint venture is issuer-reported nil in R003033 for the matching period and basis.
  • Investment in joint venture / FY2025 — 0 (nil): FY2025 Investment in joint venture is issuer-reported nil in R005559 for the matching period and basis.
  • Investment in financial assets / FY2021 — —: No separate line in FY2021 cash statement.
  • Investment in financial assets / FY2022 — —: No separate line in FY2022 cash statement.
  • Investment in financial assets / FY2023 — 0 (nil): FY2023 Investment in financial assets is issuer-reported nil in R004192 for the matching period and basis.
  • Proceeds from issue of shares / FY2022 — 0 (nil): FY2022 Proceeds from issue of shares is issuer-reported nil in R003041 for the matching period and basis.
  • Proceeds from issue of shares / FY2024 — 0 (nil): FY2024 Proceeds from issue of shares is issuer-reported nil in R004199 for the matching period and basis.
  • Proceeds from issue of shares / FY2025 — —: No share-proceeds line separately presented in FY2025.
  • Net cash from / (used in) financing activities / FY2022 — 0 (nil): FY2022 Net cash from / (used in) financing activities is issuer-reported nil in R003045 for the matching period and basis.
  • Net cash from / (used in) financing activities / FY2025 — 0 (nil): FY2025 Net cash from / (used in) financing activities is issuer-reported nil in R005567 for the matching period and basis.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

KMS joint venture cash flow (100% basis)

A$'000

MetricFY2021FY2022FY2023FY2024FY2025
Receipts from customers$'0001401352349,708253,049
Suppliers and employees (combined)$'000(20)(300)(4,086)(108,183)(194,358)
Payments to employees (split presentation)$'000Included in combined lineIncluded in combined lineIncluded in combined lineIncluded in combined line(27,651)
Payments to suppliers (split presentation)$'000Included in combined lineIncluded in combined lineIncluded in combined lineIncluded in combined line(166,707)
Interest paid on borrowings / net interest and other finance costs paid$'000——(5)(25,756)(30,207)
Net cash from / (used in) operating activities$'000163(125)(4,043)(84,234)17,093
Payments for plant and equipment (PP&E capex)$'000(31)(87)(14,794)(10,360)(3,526)
Payments for mine assets under development$'000(7,277)(73,014)(210,609)(81,388)(19,159)
Net cash used in investing activities$'000(8,320)(74,578)(227,965)(93,650)(23,561)
Proceeds from borrowings$'000——216,84097,34364,138
Repayment of borrowings$'000———Not separately presented(39,121)
Proceeds from issue of shares (JV)$'000130,1180 (nil)57,54215,000—
Net cash from / (used in) financing activities$'000134,635(317)274,02298,0636544
Net foreign exchange differences$'000——0 (nil)(40)-568
Cash and cash equivalents at end of period$'000128,21753,19795,21115,35014858

100% KMS cash flows, not Sheffield's consolidation. FY2021 amounts come from the FY2022 report's 2021 comparative KMS column. FY2025 separately reported employee and supplier payments sum to the displayed combined A$194.358m outflow; earlier split component rows remain Included in combined line. FY2025 closing cash includes the separately reported foreign exchange movement; net movement before FX is not a closing-cash bridge. JV lease payments change presentation and are excluded from this condensed component table.

Basis and presentation notes (21)
  • Payments to employees (split presentation) / FY2021 — Included in combined line: FY2021 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to employees (split presentation) / FY2022 — Included in combined line: FY2022 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to employees (split presentation) / FY2023 — Included in combined line: FY2023 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to employees (split presentation) / FY2024 — Included in combined line: FY2024 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2021 — Included in combined line: FY2021 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2022 — Included in combined line: FY2022 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2023 — Included in combined line: FY2023 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Payments to suppliers (split presentation) / FY2024 — Included in combined line: FY2024 employee and supplier payments are disclosed together in the combined row; no separate component amount is stated in the selected statement.
  • Interest paid on borrowings / net interest and other finance costs paid / FY2021 — —: Selected FY2022 KMS cash-flow statement has no separate interest-paid line for FY2021 or FY2022.
  • Interest paid on borrowings / net interest and other finance costs paid / FY2022 — —: Selected FY2022 KMS cash-flow statement has no separate interest-paid line for FY2021 or FY2022.
  • Proceeds from borrowings / FY2021 — —: No borrowing-proceeds line in selected FY2021 statement.
  • Proceeds from borrowings / FY2022 — —: No borrowing-proceeds line in selected FY2022 statement.
  • Repayment of borrowings / FY2021 — —: No borrowing-repayment line in selected FY2021 statement.
  • Repayment of borrowings / FY2022 — —: No borrowing-repayment line in selected FY2022 statement.
  • Repayment of borrowings / FY2023 — —: No borrowing-repayment line in selected FY2023 statement.
  • Repayment of borrowings / FY2024 — Not separately presented: The FY2025 audited cash-flow table's FY2024 comparative repayment cell is blank; no FY2024 amount or nil status is established there.
  • Proceeds from issue of shares (JV) / FY2022 — 0 (nil): FY2022 Proceeds from issue of shares (JV) is issuer-reported nil in R001822 for the matching period and basis.
  • Proceeds from issue of shares (JV) / FY2025 — —: FY2025 audited KMS cash-flow source row is blank; the extraction's nil interpretation (R005633) is not accepted as a reported zero.
  • Net foreign exchange differences / FY2021 — —: FX movement not separately presented in selected FY2021 cash-flow slice.
  • Net foreign exchange differences / FY2022 — —: FX movement not separately presented in selected FY2022 cash-flow slice.
  • Net foreign exchange differences / FY2023 — 0 (nil): FY2023 Net foreign exchange differences is issuer-reported nil in R004267 for the matching period and basis.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

FINANCIAL REVIEW / 04

Shareholders and capital returns

Sheffield did not pay or declare a dividend in FY2021–FY2025. The FY2023 equity raising supported KMS growth options, the South Atlantic opportunity and corporate activities; later performance-right conversions lifted the share count without an equivalent cash issue.

Sheffield share capital and dividends

Shares except issued capital in A$'000

MetricFY2021FY2022FY2023FY2024FY2025
Ordinary shares at year-endshares346,054,761346,587,555392,631,111393,169,907394,804,950
Issued capital at year-endA$'000133,091133,091155,309155,674156,224
Dividend per sharecents/sharenilnilnilnilnil

No dividend was paid or declared in any of the five reports. Share issuance and performance-right conversions changed the share count; year-end issued capital is a carrying value, not market capitalisation.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

FINANCIAL REVIEW / 05

Thunderbird operating transition

Thunderbird produced first ore in October 2023 and made its maiden bulk shipments in March 2024. FY2025 was its first full production year. The issuer attributed operating constraints to oversize material, waste-mining rates and DMU maintenance; those explanations should be kept separate from audited financial-statement amounts.

The issuer's FY2025 headline shipment aggregate and the sum of the two reported product sales rows differ. The selected annual extraction does not explain the difference, so the chart uses only the individual production rows and no combined shipment figure is inferred.

Concentrate production by product

tonnes

Concentrate production by productIlmenite concentrate production (tonnes): FY2024 220,245; FY2025 586,643 | Zircon concentrate production (tonnes): FY2024 59,741; FY2025 154,0230164k329k493k657kFY2024FY2025Ilmenite concentrate production (tonnes), FY2024: 220,245 tonnesIlmenite concentrate production (tonnes), FY2025: 586,643 tonnesZircon concentrate production (tonnes), FY2024: 59,741 tonnesZircon concentrate production (tonnes), FY2025: 154,023 tonnes
Ilmenite concentrate production (tonnes)Zircon concentrate production (tonnes)
KMS 100% basis, tonnes; FY2024 ramp-up and FY2025 first full year.

AI-generated presentation · values from Thunderbird production and sales (KMS 100% basis); no missing values plotted as zero.

Thunderbird production and sales (KMS 100% basis)

Mixed units; see row labels

MetricFY2024FY2025
Ore minedmillion tonnes4.310.409
Rougher head feed heavy-mineral grade%22.920.1
Ilmenite concentrate production (tonnes)tonnes220,245586,643
Zircon concentrate production (tonnes)tonnes59,741154,023
Ilmenite concentrate sales (tonnes)tonnes149,628594,275
Zircon concentrate sales (tonnes)tonnes43,790144,521
C1 cash cost per tonne producedA$/tNot available in checked reports296

Thunderbird first produced ore in October 2023, so FY2024 is its ramp-up year and FY2025 its first full production year. FY2024 ore mined is a rounded management narrative; FY2025 is a full-year operating-table figure. Final DB lookup confirmed the C1 cost table has 1H2025, 2H2025 and full year 2025 columns only; its A$296/t cannot be used for FY2024. FY2024 STI cost hurdles are not actual C1 A$/t. Sales rows refer to product tonnes and must not be equated to the separately reported shipment aggregate.

Basis and presentation notes (1)
  • C1 cash cost per tonne produced / FY2024 — Not available in checked reports: The FY2024 parsed operating review and remuneration targets do not establish an actual full-year Thunderbird C1 A$/t result. Relative budget thresholds and the FY2025 A$296/t result are not substituted. Final search closed on 28 September 2026; this is a limit of the checked parsed reports, not proof of issuer non-disclosure and not a zero.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

Thunderbird realised prices and unit cost, FY2025

Per dry metric tonne or tonne produced

MetricFY2025
Ilmenite concentrate realised sales price (US$/dmt)US$/dmt129
Zircon concentrate realised sales price (US$/dmt)US$/dmt549
Average realised sales price (A$/dmt, blended)A$/dmt322

US dollar product prices and Australian dollar blended prices are separate measures. C1 cost is shown in the operations table and is per tonne produced, so it is not charted against prices.

Source: Sheffield Resources annual reports, statutory statements and joint-venture notes as indicated.

Reading the figures

  • FY2024 actual C1 cash cost per tonne remains unavailable after the authorised parsed-body check. Budget-cost hurdles are not actual costs; A$296/t belongs to FY2025. No FY2024 cost or two-year trend is invented.
  • The FY2025 headline shipment aggregate differs from the sum of reported ilmenite and zircon sales rows. Different definitions may apply; this report does not assert a reconciliation.
  • Selected FY2021/FY2022 KMS profit-or-loss line detail is insufficient for a comparable 100% operating statement; the KMS profit-or-loss table begins in FY2023.
  • The condensed cash-flow tables list selected drivers and reported subtotals. FY2025 employee and supplier outflows are combined only by a disclosed two-input calculation, while earlier years retain their source combined amounts and component rows without invented splits. Lease-cash classification varies by year.
  • Technical rendering and independent semantic review are separate from publication approval. This local candidate is unpublished.
  • Final targeted check: existing parsed annual-report DB evidence was read on 28 September 2026. Not available in checked reports is a closed data-availability limit, never a numeric zero. Only the previously held cells and their directly related notes were changed; this is not a new full-report audit or publication approval.

Annual-report source registry

  • 2021 Annual ReportSheffield Resources Limited; year ended 2021-06-30; report dated 2021-09-10.
  • 2022 Annual ReportSheffield Resources Limited; year ended 2022-06-30; report dated 2022-09-15.
  • 2023 Annual ReportSheffield Resources Limited; year ended 2023-06-30; report dated 2023-09-27.
  • 2024 Annual ReportSheffield Resources Limited; year ended 2024-06-30; report dated 2024-10-14.
  • 2025 Annual ReportSheffield Resources Limited; year ended 2025-06-30; report dated 2025-09-18.

Prepared from the existing annual extraction datasets, supplemented only by selected same-company annual-report tables and saved row interpretations. No new raw-document extraction or web financial research was used for this test.

Sources, copyright and independence

The source references in this report identify the public disclosures used and should be read with the associated section, table and reporting-period qualifications. This report paraphrases, organises and compares those disclosures for descriptive and educational purposes rather than reproducing source text.

Copyright and other rights in linked reports, company names, logos and third-party materials remain with their respective owners. MII Research does not claim affiliation with or endorsement by the company covered in this report, the ASX or cited organisations.

AI-led method

This report uses AI actively and extensively for evidence extraction, comparison, organisation, calculation checks, drafting, translation planning and presentation. Material claims received reasonable editorial review against cited public sources; this was not an audit, assurance engagement or independent verification. Limitations in public sources, AI systems and review may leave errors, omissions, inconsistencies or translation, classification and interpretation errors.

Any AI-generated visual accompanying this report must carry an adjacent, visible AI-generated label or caption. Such visuals are illustrative rather than source evidence and do not replace the cited annual-report text, table or section source.

Information notice

This record is for general descriptive and educational information only. It is not financial-product, investment, legal, tax, technical or other professional advice; it is not a securities recommendation, valuation, target price, offer, solicitation or invitation to buy, sell or hold.

It does not consider any reader’s objectives, financial situation, needs, knowledge, experience or risk tolerance. Independently verify material information against the primary disclosures, obtain appropriate independent professional advice and do not use this record as the sole or primary basis for any decision.

Public sources are used in good faith, but no representation or warranty is made as to accuracy, completeness, reliability, currency or fitness for a particular purpose. To the maximum extent permitted by law, MII Research disclaims liability for direct, indirect, incidental, consequential, opportunity or investment loss arising from use of or reliance on this record; nothing excludes or limits liability that cannot lawfully be excluded or limited.

Report suspected errors to MII Research with the relevant report section and primary-source document and page reference so that the record can be reviewed and corrected where appropriate.